Articles

Relining saves time and money for residential developer

May 29, 2019

Cracks in a 525mm concrete stormwater pipe threatened sign-off and a move to the next stage of ...

Case Study: Sensitive Government Site, Darwin

May 3, 2019

With temperatures nearing 40 degrees and threatening wet-season rains to contend with, relining 225mm underground ...

Case study - RACV Royal Pines Resort

February 18, 2019

The problem

There were ongoing blockages in sewage pipes servicing the amenities block ...

Case Study - Metro Trains

October 26, 2018

Using our Greenline solution, Nuflow South West repaired a 21 metre ...

Mallacoota 1200 mm steel pipe

August 29, 2018

Work performed

Nuflow South West Pipe Relining fixed a very large pipe in Mallacoota, Victoria, near ...

Broadbeach Waters Carport

August 28, 2018

Work Performed

Using our Blueline technology, ...

EAST WATER TOWER

May 21, 2018

Work Performed

Utilising our Blueline technology, Nuflow Wide Bay relined 4.6 metre section of a 100mm ...

GOLD COAST SEWERAGE PLANT

May 21, 2018

Work Performed

Utilising our Blueline technology, Nuflow repaired 12m of a 750mm diameter reinforced ...

TUGUN BYPASS

May 21, 2018

Work Performed

Utilising our Blueline technology, Nuflow repaired three metre long patches to stop ...

MURRAY POWER STATION

May 21, 2018

Work Performed

Utilising our Blueline Technology, Nuflow Albury-Wodonga relined 2.8m of 150mm ...